Skip to Navigation Skip to Main Content Skip to Footer
 

Utility companies, including cable, telephone and internet providers, jointly use the same set of poles to preserve space and serve customers efficiently.  As a result, communication between utility pole owners and attachers is important to ensure smooth joint use operations.

Cleco’s Joint Use Management group is responsible for the management, design, construction, regulatory, legal and contractual oversight of all third-party attachments on Cleco’s utility poles. The group ensures consistency in Cleco’s assets so that all parties are treated equitably, assigned appropriate costs and held accountable for actions that might negatively impact the safety and reliability of Cleco’s electric distribution system.

All applications are available below to download.  Once the application form is completed, please submit the form and the required documents through NJUNS by creating a PA Ticket and using the member code “CLEJUP”.  Attached below is a link to a step-by-step guide on how to create an NJUNS PA Ticket.

https://www.renegadejuandconsulting.com/njuns-guides.html

There is a $300 application fee per application and a $50 administrative fee for each redesign requested on a permit. Each application is limited to 50 poles. The application fee will be invoiced after the pre-survey engineering and design has been completed, even if the application gets cancelled, and must be paid before the final construction permit will be issued.

*Application fees are reviewed quarterly. 


Process

Forms

Overhead Construction

Contact

Cleco Power
2030 Donahue Ferry Road
P.O. Box 5000
Pineville, LA 71361-5000
Attn: Novie Davidson, Cleco Power Joint Use Administrator
[email protected]