Information pertaining to Cleco's management of coal ash can be viewed in the documents listed below. If you have questions or issues accessing these documents, please contact [email protected].
-
Big Cajun II
Document Name Report Date Report CCR BCII Annual Groundwater Report 2022 Jan. 31, 2023 Annual Groundwater Report CCR BCII Annual Inspection 2022 Jan. 18, 2023 Annual Inspection 2022- BCII CCR Part A Annual Progress Report Dec. 21, 2022 Annual Progress Report CCR BCII Annual Fugitive Dust 2022 Dec. 8, 2022 Fugitive Dust Report 2021- BCII CCR Part A Annual Progress Report Jan. 31, 2022 Annual Progress Report CCR BCII Annual Groundwater Report 2021 Jan. 31, 2022 Annual Groundwater Report CCR BCII Annual Inspection 2021 Jan. 18, 2022 Annual Inspection CCR BCII Part A Demonstration Completeness Notification Jan. 11, 2022 Part A Completeness Letter CCR BCII Annual Fugitive Dust 2021 Dec. 17, 2021 Fugitive Dust Report CCR BCII Fly Ash Haz Pot Assess Oct. 17, 2021 Hazard Potential Assessment
CCR BCII Bottom Ash Haz Pot Assess Oct. 17, 2021
Hazard Potential Assessment
CCR BCII Fly Ash Struct Stab Oct. 17, 2021 Structural Stability Assessment
CCR BCII Bottom Ash Struct Stab Oct. 17, 2021 Structural Stability Assessment
CCR BCII Fly Ash Safe Fact Assess Oct. 17, 2021 Safety Factor Assessment
CCR BCII Bottom Ash Safe Fact Assess Oct. 17, 2021 Safety Factor Assessment
CCR BCII Fly Ash Inflow Oct. 17, 2021 Inflow Design Flood Control Plan
CCR BCII Bottom Ash Inflow Oct. 17, 2021 Inflow Design Flood Control Plan
CCR BCII NOI to Close Fly Ash Basin May 11, 2021 Fly Ash Basin Closure NOI CCR BCII Fly Ash Basin Closure Plan May 5, 2021 Fly Ash Basin Closure Plan CCR BCII Annual Groundwater Report 2020 Jan. 31, 2021 Annual Groundwater Report CCR BCII Annual Inspection 2020 Jan. 18, 2021 Annual Inspection CCR BCII Annual Fugitive Dust 2020 Dec. 19, 2020 Fugitive Dust Report A Holistic Approach to Closure- Part A Demonstrations Nov. 30, 2020 BCII Demonstration Part A CCR Operating Record Notification Nov. 12, 2020 BCII Operating Record Notification CCR BCII Annual Groundwater Report 2019 Jan. 31, 2020 Annual Groundwater Report CCR BCII Annual Inspection 2019 Jan. 18, 2020 Annual Inspection CCR BCII Annual Fugitive Dust 2019 Dec. 19, 2019 Fugitive Dust Report CCR BCII Annual Groundwater Report 2018 Jan. 23, 2019 Annual Groundwater Report CCR BCII Annual Inspection 2018 Jan. 18, 2019 Annual Inspection CCR BCII Annual Fugitive Dust 2018 Dec. 19, 2018 Fugitive Dust Report CCR BCII Location Restrictions Oct. 17, 2018 Location Restriction Certification CCR BCII Assessment Notification Sep. 25, 2018 Assessment Notification CCR BCII Annual Groundwater Report 2017 Jan. 31, 2018 Annual Groundwater Report CCR BCII Annual Inspection 2017 Jan. 18, 2018 Annual Inspection CCR BCII Annual Fugitive Dust 2017 Dec. 19, 2017 Fugitive Dust Report CCR BCII Statistical Method Oct. 21, 2019 Statistical Certification CCR BCII Well Network Oct. 17, 2017 Groundwater Certification CCR BCII Annual Inspection 2016 Jan. 18, 2017 Annual Inspection CCR BCII Annual Fugitive Dust 2016 Dec. 19, 2016 Fugitive Dust Report CCR BCII Bottom-Fly Ash Haz Pot Assess Oct. 17, 2016 Hazard Potential Assessment CCR BCII Bottom-Fly Ash Liner Oct. 17, 2016 Liner Design CCR BCII Bottom Ash Closure Oct. 17, 2016 Closure Plan CCR BCII Bottom Ash Post Closure Oct. 17, 2016 Post Closure Plan CCR BCII Bottom-Fly Ash Inflow Oct. 17, 2016 Inflow Design Flood Control Plan CCR BCII Bottom-Fly Ash Safe Fact Assess Oct. 17, 2016 Safety Factor Assessment CCR BCII Bottom-Fly Ash Struct Stab Oct. 17, 2016 Structural Stability Assessment CCR BCII Fly Ash Closure Oct. 17, 2016 Closure Plan CCR BCII Fly Ash Post Closure Oct. 17, 2016 Post Closure Plan CCR BCII Annual Inspection 2016 Jan. 18, 2016 Annual Inspection CCR BCII Dust Control Plan Oct. 19, 2015 Fugitive Dust Control Plan -
Dolet Hills
Document Name Report Date Report CCR Dolet Annual Groundwater Report Ash Basins Jan. 31, 2023 Annual CCR Groundwater Report CCR Dolet Annual Groundwater Report Landfill Jan. 31, 2023 Annual CCR Groundwater Report CCR DHPS Ash Basin 1 Jan. 18, 2023 Annual CCR Inspection CCR DHPS Ash Basin 2 Jan. 18, 2023 Annual CCR Inspection CCR DHPS Landfill Jan. 18, 2023 Annual CCR Inspection 2022- DHPS CCR Part A Annual Progress Report Dec. 21, 2022 Annual Progress Report CCR DHPS Part A Demonstration- Request to Withdraw Dec. 21, 2022 Part A Demonstration - Request to Withdraw CCR DHPS Annual Fugitive Dust Report Dec. 16, 2022 Annual Fugitive Dust Report CCR DHPS Notice of Intent to Close Bottom Ash Ponds Sep. 23, 2022 Notice of Intent to Close CCR DHPS Bottom Ash Ponds Closure Plan Jul. 28, 2022 Closure Plan 2021- DHPS CCR Part A Annual Progress Report Jan. 31, 2022 Annual Progress Report CCR Dolet Annual Groundwater Report Ash Basins Jan. 31, 2022 Annual CCR Groundwater Report CCR Dolet Annual Groundwater Report Landfill Jan. 31, 2022 Annual CCR Groundwater Report CCR DHPS Ash Basin 1 Jan. 18, 2022 Annual CCR Inspection CCR DHPS Ash Basin 2 Jan. 18, 2022 Annual CCR Inspection CCR DHPS Landfill Jan. 18, 2022 Annual CCR Inspection CCR Part A Demonstration Completeness Notification Jan. 11, 2022 Part A Completeness Letter CCR DHPS Annual Fugitive Dust Report Dec. 17, 2021 Annual Fugitive Dust Report CCR DHPS Bottom Ash Basin #1 Haz Pot Assess Oct. 14, 2021 Hazard Potential Assessment CCR DHPS Bottom Ash Basin #1 Safe Fact Assess Oct. 14, 2021 Safety Factor Assessment CCR DHPS Bottom Ash Basin #1 Struct Stab Assess Oct. 14, 2021 Structural Stability Assessment CCR DHPS Bottom Ash Basin #2 Haz Pot Assess Oct. 14, 2021 Hazard Potential Assessment CCR DHPS Bottom Ash Basin #2 Safe Fact Assess Oct. 14, 2021 Safety Factor Assessment CCR DHPS Bottom Ash Basin #2 Struct Stab Assess Oct. 14, 2021 Structural Stability Assessment CCR DHPS Bottom Ash Basin #1 & #2 Inflow Flood Control Plan Oct. 13, 2021 Inflow Design Flood Control Plan CCR DHPS Landfill Run-On Run-Off Controls Oct. 13, 2021 Run-On Run-Off Control Plan CCR Dolet Annual Groundwater Report Ash Basins Jan. 31, 2021 Annual CCR Groundwater Report CCR Dolet Annual Groundwater Report Landfill Jan. 31, 2021 Annual CCR Groundwater Report CCR DHPS Ash Basin 1 Jan. 14, 2021 Annual CCR Inspection CCR DHPS Ash Basin 2 Jan. 14, 2021 Annual CCR Inspection CCR DHPS Landfill Jan. 14, 2021 Annual CCR Inspection CCR DHPS Annual Fugitive Dust Report Dec. 19, 2020 Annual Fugitive Dust Report A Holistic Approach to Closure- Part A Demonstrations Nov. 30, 2020 DHPS Demonstration Part A CCR Operating Record Notification Nov. 12, 2020 DHPS Operating Record Notification CCR Dolet Annual Groundwater Report Ash Basins Jan. 31, 2020 Annual CCR Groundwater Report CCR Dolet Annual Groundwater Report Landfill Jan. 31, 2020 Annual CCR Groundwater Report CCR DHPS Ash Basin 1 Jan. 10, 2020 Annual CCR Inspection CCR DHPS Ash Basin 2 Jan. 10, 2020 Annual CCR Inspection CCR DHPS Landfill Jan. 10, 2020 Annual CCR Inspection CCR DHPS Annual Fugitive Dust Report Dec. 19, 2019 Annual Fugitive Dust Report CCR Dolet Annual Groundwater Report Ash Basins Jan. 31, 2019 Annual CCR Groundwater Report CCR Dolet Annual Groundwater Report Landfill Jan. 31, 2019 Annual CCR Groundwater Report CCR DHPS Ash Basin Pond No.1 Jan. 11, 2019 Annual CCR Inspection CCR DHPS Ash Basin Pond No.2 Jan. 11, 2019 Annual CCR Inspection CCR DHPS Landfill Jan. 11, 2019 Annual CCR Inspection CCR DHPS Annual Fugitive Dust Report Dec. 19, 2018 Annual Fugitive Dust Report CCR DHPS Ash Basin 1 Fault Areas Oct. 17, 2018 Fault Areas Location Restriction CCR DHPS Ash Basin 2 Fault Areas Oct. 17, 2018 Fault Areas Location Restriction CCR DHPS Ash Basin 1 Seismic Oct. 17, 2018 Seismic Impact Zones Location Restriction CCR DHPS Ash Basin 2 Seismic Oct. 17, 2018 Seismic Impact Zones Location Restriction CCR DHPS Ash Basin 1 Unstable Areas Oct. 17, 2018 Unstable Areas Location Restriction CCR DHPS Ash Basin 2 Unstable Areas Oct. 17, 2018 Unstable Areas Location Restriction CCR DHPS Landfill Unstable Areas Oct. 17, 2018 Unstable Areas Location Restriction CCR DHPS Ash Basin 1 Uppermost Aquifer Oct. 17, 2018 Uppermost Aquifer Location Restriction CCR DHPS Ash Basin 2 Uppermost Aquifer Oct. 17, 2018 Uppermost Aquifer Location Restriction CCR DHPS Ash Basin 1 Wetlands Oct. 17, 2018 Wetlands Location Restriction CCR DHPS Ash Basin 2 Wetlands Oct. 17, 2018 Wetlands Location Restriction CCR DHPS Landfill Closure Apr. 24, 2018 Closure Plan CCR DHPS Landfill Post Closure Apr. 24, 2018 Post Closure Plan CCR Dolet Annual Groundwater Report Ash Basins Jan. 31, 2018 Annual CCR Groundwater Report CCR Dolet Annual Groundwater Report Landfill Jan. 31, 2018 Annual CCR Groundwater Report CCR Ash Basin 1 Dolet Jan. 12, 2018 Annual CCR Inspection CCR Ash Basin 2 Dolet Jan. 12, 2018 Annual CCR Inspection CCR Landfill Dolet Jan. 12, 2018 Annual CCR Inspection CCR DHPS Annual Fugitive Dust Report Dec. 19, 2017 Annual Fugitive Dust Report CCR DHPS Statistical Method Oct. 17, 2017 Statistical Certification CCR DHPS Landfill Well Network Oct. 17, 2017 Groundwater Certification CCR DHPS Ash Basin Well Network Oct. 17, 2017 Groundwater Certification CCR Ash Basin 1 Dolet Jan. 13, 2017 Annual CCR Inspection CCR Ash Basin 2 Dolet Jan. 13, 2017 Annual CCR Inspection CCR Landfill Dolet Jan. 13, 2017 Annual CCR Inspection CCR DHPS Annual Fugitive Dust Report Dec. 19, 2016 Annual Dust Report CCR DHPS Bottom Ash Basin #1 Closure Oct. 17, 2016 Closure Plan CCR DHPS Bottom Ash Basin #1 Haz Pot Assess Oct. 17, 2016 Hazard Potential Assessment CCR DHPS Bottom Ash Basin #1 Hist Const Oct. 17, 2016 History Construction CCR DHPS Bottom Ash Basin #1 Liner Design Oct. 17, 2016 Liner Design CCR DHPS Bottom Ash Basin #1 Post Closure Oct. 17, 2016 Post Closure Plan CCR DHPS Bottom Ash Basin #1 Safe Fact Assess Oct. 17, 2016 Safety Factor Assessment CCR DHPS Bottom Ash Basin #1 Struct Stab Assess Oct. 17, 2016 Structural Stability Assessment CCR DHPS Bottom Ash Basin #2 Closure Oct. 17, 2016 Closure Plan CCR DHPS Bottom Ash Basin #2 Haz Pot Assess Oct. 17, 2016 Hazard Potenital Assessment CCR DHPS Bottom Ash Basin #2 Hist Const Oct. 17, 2016 History Construction CCR DHPS Bottom Ash Basin #2 Post Closure Oct. 17, 2016 Post Closure Plan CCR DHPS Bottom Ash Basin #2 Safe Fact Assess Oct. 17, 2016 Safety Factor Assessment CCR DHPS Bottom Ash Basin #2 Struct Stab Assess Oct. 17, 2016 Structural Stability Assessment CCR DHPS Bottom Ash Basin #1 & #2 Inflow Flood Control Plan Oct. 17, 2016 Inflow Design Flood Control Plan CCR DHPS Landfill Run-On Run-Off Controls Oct. 17, 2016 Run-On Run-Off Control Plan CCR Dust Control Plan Dolet Feb. 1, 2016 Fugitive Dust Control Plan CCR Ash Basin 1 Dolet Jan. 15, 2016 Annual CCR Inspection CCR Ash Basin 2 Dolet Jan. 15, 2016 Annual CCR Inspection CCR Landfill Dolet Jan. 15, 2016 Annual CCR Inspection -
Rodemacher
Document Name Report Date Report CCR Rod Fly Ash Pond Closure NOI Feb. 1, 2023 Fly Ash Pond Closure NOI CCR Rod Annual Groundwater Report Jan. 31, 2023 Annual CCR Groundwater Report CCR Rod Bottom Ash Pond Jan. 18, 2023 Annual CCR Inspection CCR Rod Fly Ash Pond Jan. 18, 2023 Annual CCR Inspection 2022- Rod CCR Part A Annual Progress Report Dec. 21, 2022 Annual Progress Report
CCR Rod Fly Ash Closure Plan Minor Mod Dec. 21, 2022 Closure Plan Minor Modification CCR Rod Part B Demonstration- Request to Withdraw Dec. 21, 2022 Part B Demonstration - Request to Withdraw CCR Rod Annual Fugitive Dust Report Dec. 16, 2022 Annual Fugitive Dust Report CCR Rod Annual Face to Face Dec. 13, 2022 Annual Face to Face 2021- Rod CCR Part A Annual Progress Report Jan. 31, 2022 Annual Progress Report CCR Rod Annual Groundwater Report Jan. 31, 2022 Annual CCR Groundwater Report CCR Rod Fly Ash Pond Jan. 18, 2022 Annual CCR Inspection CCR Rod Bottom Ash Pond Jan. 18, 2022 Annual CCR Inspection CCR Part A Demonstration Completeness Notification Jan. 11, 2022 Part A Completeness Letter CCR Rod Annual Fugitive Dust Report Dec. 17, 2021 Annual Fugitive Dust Report CCR Rod Annual Face to Face Dec. 1, 2021 Annual Face to Face CCR Rod Fly Ash Pond Haz Pot Assess Oct. 17, 2021 Hazard Potential Assessment
CCR Rod Bottom Ash Pond Haz Pot Assess Oct. 17, 2021 Hazard Potential Assessment
CCR Rod Fly Ash Pond Safe Fact Assess Oct. 17, 2021 Safety Factor Assessment
CCR Rod Bottom Ash Pond Safe Fact Assess Oct. 17, 2021 Safety Factor Assessment
CCR Rod Fly Ash Pond Struct Stab Oct. 17, 2021 Structural Stability Assessment
CCR Rod Bottom Ash Pond Struct Stab Oct. 17, 2021 Structural Stability Assessment
CCR Rod Fly Ash Pond Inflow Oct. 17, 2021 Inflow Design Flood Control Plan
CCR Rod Bottom Ash Pond Inflow Oct. 17, 2021 Inflow Design Flood Control Plan CCR Rod Annual Groundwater Report Jan. 31, 2021 Annual CCR Groundwater Report CCR Rod Fly Ash Pond Jan. 14, 2021 Annual CCR Inspection CCR Rod Bottom Ash Pond Jan. 14, 2021 Annual CCR Inspection CCR Rod Annual Fugitive Dust Report Dec. 19, 2020 Annual Fugitive Dust Report Application to Submit Alternate Liner Demonstrations Pursuant to 40 C.F.R § 257.71(d)(1) Dec. 14, 2020 BEC Application Notice of Intent to Submit Alternate Liner Demonstrations Dec. 14, 2020 EPA Notice of Intent CCR Rod Annual Face to Face Dec. 2, 2020 Annual Face to Face Part A CCR Operating Record Notification Nov. 12, 2020 BEC Operating Record Notification A Holistic Approach to Closure- Part A Demonstrations Nov. 25, 2020 BEC Demonstrations CCR Rod Annual Groundwater Report Jan. 31, 2020 Annual CCR Groundwater Report CCR Rod Fly Ash Pond Jan. 10, 2020 Annual CCR Inspection CCR Rod Bottom Ash Pond Jan. 10, 2020 Annual CCR Inspection CCR Rod Annual Fugitive Dust Report Dec. 19, 2019 Annual Fugitive Dust Report CCR Rod Annual Face to Face Dec. 11, 2019 Annual Face to Face CCR Rod Annual Groundwater Report Jan. 31, 2019 Annual CCR Groundwater Report CCR Rod Fly Ash Pond Jan. 11, 2019 Annual CCR Inspection CCR Rod Bottom Ash Pond Jan. 11, 2019 Annual CCR Inspection CCR Rod Annual Fugitive Dust Report
Dec. 19, 2018 Annual CCR Groundwater Report CCR Rod Annual Face to Face Dec. 04, 2018 Annual Face to Face 2018 CCR Rod Bottom Ash Pond Fault Areas Oct. 17, 2018 Fault Areas Location Restriction CCR Rod Fly Ash Pond Fault Areas Oct. 17, 2018 Fault Areas Location Restriction CCR Rod Bottom Ash Pond Seismic Oct. 17, 2018 Seismic Impact Zones Location Restriction CCR Rod Fly Ash Pond Seismic Oct. 17, 2018 Seismic Impact Zones Location Restriction CCR Rod Bottom Ash Pond Unstable Areas Oct. 17, 2018 Unstable Areas Location Restriction CCR Rod Fly Ash Pond Unstable Areas Oct. 17, 2018 Unstable Areas Location Restriction CCR Rod Bottom Ash Pond Uppermost Aquifer Oct. 17, 2018 Uppermost Aquifer Location Restriction CCR Rod Fly Ash Pond Uppermost Aquifer Oct. 17, 2018 Uppermost Aquifer Location Restriction CCR Rod Bottom Ash Pond Wetlands Oct. 17, 2018 Wetlands Location Restriction CCR Rod Fly Ash Pond Wetlands Oct. 17, 2018 Wetlands Location Restriction CCR Rod Annual Groundwater Report Jan. 31, 2018 Annual CCR Groundwater Report CCR Rod Fly Ash Pond Jan. 12, 2018 Annual CCR Inspection CCR Rod Bottom Ash Pond Jan. 12, 2018 Annual CCR Inspection CCR Rod Annual Fugitive Dust Report Dec. 19, 2017 Annual Fugitive Dust Report CCR Rod Annual Face to Face Dec. 05, 2017 Annual Face to Face 2017 CCR Rod Statistical Method Oct. 17, 2017 Statistical Certification CCR Rod Well Network Oct. 17, 2017 Groundwater Certification CCR Rod Emergency Action Plan May 3, 2017 Emergency Action Plan CCR Rod Bottom Ash Pond Jan. 13, 2017 Annual CCR Inspection CCR Rod Fly Ash Pond Jan. 13, 2017 Annual CCR Inspection CCR Rodemacher Annual Fugitive Dust Report Dec. 19, 2016 Annual Fugitive Dust Report CCR Rod Bottom Ash Pond Closure Oct. 17, 2016 Closure Plan CCR Rod Bottom Ash Pond Haz Pot Assess Oct. 17, 2016 Hazard Potential Assessment CCR Rod Bottom Ash Pond Hist Const Oct. 17, 2016 History of Construction CCR Rod Bottom Ash Pond Inflow Oct. 17, 2016
Inflow Design Flood Control Plan CCR Rod Bottom Ash Pond Liner Oct. 17, 2016 Liner Design CCR Rod Bottom Ash Pond Post Closure Oct. 17, 2016 Post Closure Plan CCR Rod Bottom Ash Pond Safe Fact Assess Oct. 17, 2016 Safety Factor Assessment CCR Rod Bottom Ash Pond Struct Stab Oct. 17, 2016 Structural Stability Assessment CCR Rod Fly Ash Pond Closure Oct. 17, 2016 Closure Plan CCR Rod Fly Ash Pond Haz Pot Assess Oct. 17, 2016 Hazard Potential Assessment CCR Rod Fly Ash Pond Hist Const Oct. 17, 2016 History of Construction CCR Rod Fly Ash Pond Inflow Oct. 17, 2016
Inflow Design Flood Control Plan CCR Rod Fly Ash Pond Liner Oct. 17, 2016 Liner Design CCR Rod Fly Ash Pond Post Closure Oct. 17, 2016 Post Closure Plan CCR Rod Fly Ash Pond Safe Fact Assess Oct. 17, 2016 Safety Factor Assessment CCR Rod Fly Ash Pond Struct Stab Oct. 17, 2016 Structural Stability Assessment CCR Dust Control Plan Rodemacher Oct. 19, 2015 Fugitive Dust Control Plan CCR Rod Fly Ash Pond Jan. 15, 2016 Annual CCR Inspection CCR Rod Bottom Ash Pond Jan. 15, 2016 Annual CCR Inspection